Rapid Metro Rail Gurgaon Limited (RMGL) and Rapid MetroRail Gurgaon South Limited (RMGSL) have reported substantial growth in both ridership and revenue for the first quarter of the financial year 2024-25.
Haryana chief secretary TVSN Prasad, while presiding over the board meeting of Haryana Mass Rapid Transport Corporation Limited, said that for the period from April to June 2024, total income surged by 10.49% compared to the same period last year, reaching Rs 8.11 crore.
This increase is directly attributed to an 8.75% rise in ridership during the same period. The number of passengers utilising the Rapid Metro network saw steady growth, with April, May and June 2024 recording 12.20 lakh, 13.48 lakh and 12.30 lakh passengers, respectively. Prasad said that the proposed metro link connecting Sector 56 in Gurgaon to Panchgaon will cover 36 kilometres and include 28 elevated stations.